Live Part Two art-department checklist. Revision October 12, 2026; aligned to the revised14-beat outline. Part One has a separate list. Checkboxes mean director-approved asset delivered and linked, not merely assigned or generated. All tasks start unclaimed; no new art generation is requested here.

Claim an item by recording owner/computer and start date before work. Status: Unclaimed → Working → Review → Approved; Blocked, Needs revision or Retired when appropriate. Keep stable IDs; never reuse retired IDs. Link references, prompts, versions and final files under the item. Approval of the story premise does not approve a design.

After each story change, update affected entries in all three lists, beat numbers, dependencies and required damage states. Preserve existing owners and delivery links; reopen affected completed items as Needs revision. Keep speculative assets labelled and avoid duplicate work across computers.

Current corrections

No open water channels or repurposed channel district. Enclosed hydro turbines are optional infrastructure only. Jor and Ungated begin already moving; no assembly recess or preparation tableau. Devastated, dark, gritty, smoky war damage with Heaven construction above. Final technical vulnerability stays private to writers.

Environment checklist